All moving in the right direction

It’s been a while since my last post – Dwr Cymru have returned and filled the hole so the water connection is complete.

This slideshow requires JavaScript.

Inside, the timber frame is up and the first floor i-beams have been installed.

This slideshow requires JavaScript.

The chipboard has also been layed on the first floor and some of the upstairs studwork has gone up.

This slideshow requires JavaScript.

Outside, the scaffolding is up and the roof is coming off.

This slideshow requires JavaScript.

The front skylights have also been cut out – we can’t wait to see the view from upstairs.

This slideshow requires JavaScript.

Outside, further work has been carried out on the landscaping and the bat-shed.

This slideshow requires JavaScript.

Water in and stud work on the way up

Dwr Cymru have come and connected the water for the bargain price of £1400! The trench is still uncovered as apparently it is a different crew needed to fill in the trench and tarmac!

The last of the ecclesiastical features remaining on the walls have been removed, it is a shame to lose some of these features, but everything has to be wrapped in 100mm of insulation, so unfortunately they were never going to be seen. We now need to see how they can be used to enhance the project later down the line; or failing that, sold to pay off our debts!!!

The stud work is making great progress. It won’t be long before the perimeter is fully studded and the first floor beams are ready to go in.

Weekend in Crickhowell and Llangattock

We’re having a lovely weekend in Crickhowell and Llangattock. We’re staying at the Horseshoe Inn, Llangattock, which is full of inspirational ideas for using salvaged resources.

We’ve visited Webbs in Crickhowell where we’ve discovered a great range of Dimplex artificial log burner stoves which we think will be the solution to our needs.

We’ve also visited Beatrice and Maud in Crickhowell, who have a lovely mix of antique items that will really fit into the conversion, just need to hold off a while until we know where everything will fit.

An exciting week . . .

With the concrete down, it’s full steam ahead with the studwork. This starts with a course of 3 bricks, which are almost all down. The studwork will go on top of this.

The kitchen had also arrived and had been put into storage until it’s needed, hopefully not too long!