It’s been a while since my last post – Dwr Cymru have returned and filled the hole so the water connection is complete.
Inside, the timber frame is up and the first floor i-beams have been installed.
The chipboard has also been layed on the first floor and some of the upstairs studwork has gone up.
Outside, the scaffolding is up and the roof is coming off.
The front skylights have also been cut out – we can’t wait to see the view from upstairs.
Outside, further work has been carried out on the landscaping and the bat-shed.