Our part of the water pipe is in – time to call Dwr Cymru.
Month: October 2017
More external drainage
More work on the drainage outside.
Threshold sorted
A bit of work around the threshold.
Drainage going in
The drainage is going in and the concrete base for the Air Source Heating is in place.
More external works
The garden is starting to take shape and preperation for external drainage works.
Another window adjusted
This will eventually become the utility room window.

Hardcore in
The hardcore is in and the internal drainage pipes have been buried.
More walls removed
More work on the walls in front of the windows – can’t wait to see these as a final feature.